NEXT ROBOTTECHDATA CENTER EPC
15 — 17Testing, handover & operations

Nothing is handed over untested

The last months of the programme decide whether the facility behaves the way the drawings said it would. They end with a signed dossier, a trained operations team and a twin that stays in sync with the plant.

15Testing & commissioning

Prove every failure mode

Five levels, from witnessed factory tests to an integrated systems test that kills the utility at full load bank and watches the whole facility ride it out.

Commissioning panel0 / 10 · 0%
  • L2
    MV switchgear & protection
    Primary injection, selectivity, interlocks
    pending
  • L2
    Transformer energisation
    Ratio, insulation, oil, thermal soak
    pending
  • L3
    Generator black start
    Start time, paralleling, step load, fuel
    pending
  • L3
    UPS & battery autonomy
    Transfer, harmonics, full discharge test
    pending
  • L3
    Cooling capacity & failover
    Design day, pump swap, CDU redundancy
    pending
  • L3
    Fire detection & suppression
    ASD response, discharge, room integrity
    pending
  • L3
    Network & structured cabling
    OTDR, insertion loss, path diversity
    pending
  • L3
    BMS / DCIM points
    Point-to-point verification, alarms, trends
    pending
  • L4
    Integrated systems test
    Utility failure with full load, all modes
    pending
  • L5
    Full load bank & thermal runaway
    100% load, cooling loss, recovery curve
    pending
Load bank testing
Resistive load banks simulate the full IT load so every system is proven before a single server arrives.
L1–L2Factory acceptance and component verification
L3System-level functional testing
L4Integrated systems test across all systems
L5Full load, thermal runaway and recovery
16Go-live & handover

Ready for operation

Handover is a deliverable, not a date. You receive a certified facility, the full as-built set, spares, O&M procedures and an operations team that has already run it under load.

CommissioningIntegrated systems testLoad bank testReliability runCertificationOperational handover
Completed and operating data center campus
Status
Ready for operation
0.000%
Certified availability
0%
Systems commissioned
0.00
Measured PUE at handover
0 h
Fuel autonomy verified
Handover package
  • As-built drawings and federated model
  • Commissioning dossier, all levels
  • O&M manuals and maintenance schedule
  • Spares inventory and vendor contacts
  • Trained operations team
17Digital twin

The facility, live

Every asset we install exists twice: once in the building and once in the model. Select any piece of plant to see what it is doing right now.

Digital twin of the data center
Telemetry live
Online

UPS 04

Capacity
2.4 MW
Load
61%
Autonomy
7 min
Mode
Double conversion
Also monitored
DCIMBMSEPMSASDACSVSS
Project control

You see what we see

Earned value, schedule performance, procurement status and commissioning progress — one dashboard, updated weekly, with the same numbers we run the site on.

Overall progress
0%
Earned value against baseline
Schedule
0%
SPI 0.98 · 11 days float
Budget
0%
CPI 1.01 · contingency 62% held
Procurement
0%
Long-lead items all placed
Construction
0%
Envelope closed, fit-out running
Equipment
0%
MEP installation in three halls
Commissioning
0%
L1–L2 started on power train
Master scheduleMonth 18 / 24
1471013161922
Site & permits100%
Feasibility100%
Concept design100%
Detailed engineering100%
Long-lead procurement84%
Earthworks & foundations100%
Structure & envelope92%
Power infrastructure71%
Cooling infrastructure63%
IT & network fit-out34%
Commissioning L1–L512%
Handover & go-live0%
Next step

Tell us what you are building

Send the site status, the grid offer and the target load. You get a concept, a power and cooling strategy and an indicative CAPEX back.