NEXT ROBOTTECHDATA CENTER EPC
Selected projects

Measured at handover, not promised

Three facilities in three very different grid and climate conditions, with the density, PUE and programme each of them actually achieved.

Selected projects

Delivered, measured, running

Representative projects across climates, grid conditions and densities. Figures are the measured values at handover, not design targets.

50 MW AI training campus
01Delivered

50 MW AI training campus

Arid inland site, dedicated 110 kV connection

EPC — three halls, own substation, dry-cooler field, DLC to every rack

IT load
50 MW
Racks
1,200
Density
80 kW
PUE
1.18
Tier
III
Programme
18 mo
8 MW urban colocation retrofit
02Delivered

8 MW urban colocation retrofit

Dense city block, two diverse fibre entries

Design & Build — structural strengthening, rooftop plant, 2N power train

IT load
8 MW
Racks
410
Density
20 kW
PUE
1.32
Tier
IV
Programme
14 mo
24 MW free-cooling HPC facility
03Delivered

24 MW free-cooling HPC facility

Cold climate, hydro-fed grid connection

EPCM — long hall, air-side free cooling, immersion pilot block

IT load
24 MW
Racks
600
Density
40 kW
PUE
1.09
Tier
III
Programme
16 mo