Where the programme is held or lost
Site establishment through to a weathertight building with its plant installed — sequenced so equipment lands exactly when the building can receive it.
Twenty-two months, one site
Greenfield site
Land secured, access road built, grid connection agreed.
Long-lead items drive the date
A transformer ordered late cannot be recovered by working weekends. We place the critical packages while the design is still on the board and track every unit from purchase order to installed position.

Technical and financial screening before tender
Witnessed FAT on all critical plant
Handled with the freight, not after it
Climate-controlled storage and rotation
Thousands of connections, all recorded
Installation is where quality is either built in or lost. Every lift has a method statement, every termination a torque record, every weld a test certificate.
- Equipment delivery01Offloading, inspection, damage survey
- Positioning02Heavy lifts, skates, temporary openings
- Mechanical installation03Anchoring, pipework, welding, pressure tests
- Electrical installation04Cabling, terminations, torque records
- Network05Trays, trunks, patching, labelling
- Cooling connection06CDU tie-in, flushing, water quality
- Integration07BMS points, interlocks, alarms


Tell us what you are building
Send the site status, the grid offer and the target load. You get a concept, a power and cooling strategy and an indicative CAPEX back.