NEXT ROBOTTECHDATA CENTER EPC
06 — 07 · 13 — 14Civil works, supply & installation

Where the programme is held or lost

Site establishment through to a weathertight building with its plant installed — sequenced so equipment lands exactly when the building can receive it.

06Civil construction

Twenty-two months, one site

M 0001 / 14

Greenfield site

Land secured, access road built, grid connection agreed.

Construction progress
0%
0002050912162022
13Equipment supply

Long-lead items drive the date

A transformer ordered late cannot be recovered by working weekends. We place the critical packages while the design is still on the board and track every unit from purchase order to installed position.

OrderedManufacturingFAT passedShippingCustomsDeliveredInstalled
Power transformers 63 MVA
Europelead 60–90 weeks
Installed
MV switchgear 20 kV
Europelead 40–60 weeks
Delivered
Diesel generator sets
Europe / Asialead 50–70 weeks
Customs
Modular UPS & batteries
Asialead 30–45 weeks
Customs
Free-cooling chillers
Europelead 35–50 weeks
Shipping
Coolant distribution units
Asia / USlead 25–40 weeks
FAT passed
Racks & busway
Europelead 16–28 weeks
FAT passed
Network & fibre plant
Asialead 12–24 weeks
Manufacturing
Global equipment logistics
Sea, air, rail and heavy haul — sequenced so equipment lands when the building can receive it.
Vendor qualification

Technical and financial screening before tender

Factory acceptance

Witnessed FAT on all critical plant

Customs & permits

Handled with the freight, not after it

Site preservation

Climate-controlled storage and rotation

14Installation

Thousands of connections, all recorded

Installation is where quality is either built in or lost. Every lift has a method statement, every termination a torque record, every weld a test certificate.

  1. Equipment delivery01Offloading, inspection, damage survey
  2. Positioning02Heavy lifts, skates, temporary openings
  3. Mechanical installation03Anchoring, pipework, welding, pressure tests
  4. Electrical installation04Cabling, terminations, torque records
  5. Network05Trays, trunks, patching, labelling
  6. Cooling connection06CDU tie-in, flushing, water quality
  7. Integration07BMS points, interlocks, alarms
Heavy equipment installation
Chiller module lifted to the roof platform; transformer rolled in on skates through a temporary opening.
Rack installation
Rack rows bolted to seismic base rails in a finished hall.
Next step

Tell us what you are building

Send the site status, the grid offer and the target load. You get a concept, a power and cooling strategy and an indicative CAPEX back.

Start a project