NEXT ROBOTTECHDATA CENTER EPC
03 — 05Concept, design & documentation

Every interface resolved before anything is ordered

Concept design fixes the topology, detailed engineering resolves every interface between six disciplines, and the documentation set carries that intent all the way to as-built.

03Concept design

The building is a machine

Rotate it, take it apart, isolate a single system. Every layer below is a discipline we design, procure, install and commission ourselves.

All systems
Complete facility
04Engineering design

Six disciplines, one federated model

Data centers fail at the interfaces — where the busway meets the pipe rack, where the fire damper meets the containment. We design every discipline in one model and resolve those interfaces before anything is ordered.

Architecture

Architecture

01
  • Hall geometry & rack grid
  • Technical room adjacency
  • Fire compartments
  • Security zoning
  • Equipment entry routes
Structural

Structural

02
  • Piling & foundation design
  • Steel frame & long spans
  • Floor loading 15–20 kN/m²
  • Vibration & seismic restraint
  • Roof plant support steel
Electrical

Electrical

03
  • HV/MV connection & switchyard
  • Transformers & MV switchgear
  • UPS, batteries, generators
  • Busway, PDU, rack power
  • Selectivity, arc flash, earthing
Mechanical

Mechanical

04
  • Chillers & dry coolers
  • Pumps, headers, pipe racks
  • CRAH / fan wall & containment
  • CDU & direct liquid cooling
  • CFD verification
Network

Network

05
  • Diverse carrier entries
  • Meet-me rooms & cross-connect
  • Spine / leaf & AI fabric
  • Structured cabling & trays
  • DCIM & monitoring
Fire Protection

Fire Protection

06
  • Aspirating smoke detection
  • Inert gas suppression
  • Pressure relief & interlocks
  • Compartment integrity testing
  • Battery room protection
0
Coordinated disciplines
0
BIM level of detail (LOD)
0
Hard clashes at issue
0%
Design carried into as-built
05Technical documentation

One controlled set of truth

Every drawing, calculation, procedure and test record lives in one common data environment — versioned, reviewed and traceable from concept through to the as-built you receive at handover.

Common data environment18 sets
DocumentRevSize
  • DWGArchitectural drawingsF96 MB
  • DWGStructural drawingsE74 MB
  • DWGElectrical single-lineG11 MB
  • DWGMechanical schematicsE23 MB
  • IFCFederated BIM modelD2.4 GB
Drawings and federated BIM model
01Master plan & concept
02Architectural & structural
03Electrical & mechanical
04Federated BIM (IFC)
05Specifications & BOQ
06Cost estimate & schedule
07Method statements & ITP
08Commissioning & as-built
Next step

Tell us what you are building

Send the site status, the grid offer and the target load. You get a concept, a power and cooling strategy and an indicative CAPEX back.

Start a project